Concrete placement procedure
You are a civil engineer. Describe the correct concrete placement procedure for the element [BEAM/SLAB/COLUMN/FOUNDATION]: preparation and prior verification (formwork, reinforcement, shoring), concrete placement and consolidation, hydration control and surface finishing, and curing. Point out precautions with joints, hot/rainy weather, and errors that cause defects.